INTERCONNECTOR DAY30

DAY THIRTY

Autism 

MARTIN HOGAN, a medical doctor and consultant occupational and environmental physician from UCC returned to address the hearing on behalf of EirGrid. Dr Hogan was asked to respond to earlier submissions by residents and landowners about the potential effect of the power lines on a person with autism.

Dr Hogan said ASD was not an uncommon disorder. It was present in up to 1% of the population in Ireland, with more boys affected than girls. He said it was a processing disorder rather than anything else. In terms of all the literature he had reviewed on the subject, there was no evidence he could find that power transmission lines would make life any more difficult than it already was for a person with ASD.

He was asked about his qualifications and experience of dealing with children with autism. Dr Hogan said he had no hands on experience in that regard but he did have friends who had children with autism. He said at a previous module there was no real reason to suspect that people with ASD would be adversely affected by the project.

The questions had been raised by Geraldine Graydon MSc, an autism specialist trainer and advocate. She had appeared earlier at the hearing on behalf of Colette McElroy, Ballintra, who has a son with autism and was concerned that he could be affected by the noise emitted from the power lines. Ms Graydon had explained that people with autism spectrum condition thrived on having a predictable familiar environment, with routine and structure being critical to their day-to-day activities.

When changes occurred to the individual’s routine or environment, like intermittent noise or buzzing from power lines, this could and does cause individuals with autism to experience extreme levels of stress. They would be unable to sleep or concentrate, pace up and down or engage in stimming behavior that could lead to self-injury, which would also impact on their families’ well-being.

TOM CANNON, a consultant for EirGrid, said Mrs McElroy’s house was 475m from a proposed pylon. During the construction phase there would be 154 traffic movements spread out over a period of time. A noise consultant said the noise of the vehicles used would not cause a significant impact. EirGrid also revealed that they had agreed to underground an existing 38kV overhead ESB line that ran beside the house.

This section involved landowners and groups in Co. Cavan

ANDREW CLARKE spoke on behalf of residents in Muff, near Kingscourt. “We’re not putting up with it and are ready to fight”, he said. He told the two inspectors they could not let the line happen and invited them to visit the townland. Local residents and landowners had been among the first to tell EirGrid to put the interconnector underground when the original proposal was made. He said EirGrid had lost the plot and had forgotten about rural Ireland.

AONGHUS BYRNE, Principal of Laragh Muff National School, said it was thriving and at the heart of the community. EirGrid wanted to place a pylon within 342m of their football pitch, making it the closest school along the line and destroying the beautiful views of the landscape enjoyed by the 135 pupils and ten staff. He could guarantee that if he asked them all, not one child would want the pylons to be put up. EirGrid seemed to be reverting to ‘chalk and slate’ technology and had not even looked at partially undergrounding the line near their school. Mr Byrne also expressed concern about construction traffic using a narrow road alongside the school to access a pylon site.

JOHN SMITH, Lisagoan, off the Kingscourt to Shercock road, said if the planned overhead line was allowed, it would be there for generations to come, ruining this beautiful country. He also claimed it could put people’s health in danger. He said he had spent a lot of money and time trying to improve the wet heavy clay land by draining and re-seeding. All that could be in vain if EirGrid got the go-ahead. Mr Smith said he was putting his trust in the planning authorities to make the right decision to go underground. It would be a better choice economically, environmentally and socially.

KEVIN SHIELS, Cordoagh, said one of the proposed pylons would be around 75m from the edge of his garden. EirGrid were also planning to put an access route for pylon construction 2m away from an entrance into the garden where his children played.

JIM BAIRD, Cordoagh, a neighbour of Mr Shiels, is a retired project manager with Gypsum. He said rural Ireland needed to be protected. EirGrid he claimed had very little regard for the rural population. He said rural Ireland vehemently objected to what was still the same ill-conceived scheme for an overhead line, an antiquated technology. and it was being pursued at their expense. “This has got to stop”, he said and he hoped they would get the just outcome they deserved.

KEVIN SMITH of the Loughanleagh and Muff Heritage Trust said the mountain was one of the highest points in the area with a view of eleven counties from the top. The proposed line would come close to the viewpoints and would be detrimental in his view. It would also be very near the site of one of the oldest fairs in Ireland dating back to 1608. The ridge of the mountain had three prehistoric cairns. The proposed interconnector would affect plans by the Trust to promote the area’s history and heritage.

EirGrid were given an opportunity to reply to each of the submissions, including comments on proposed access routes. A consultant pointed out that traffic management plans would be made for construction traffic, including at schools such as Muff N.S. where a speed limit of 30km/h would be implemented.

AIDAN GEOGHEGAN, EirGrid project manager, responded to concerns about the potential health risks and explained why an overhead route had been chosen instead of undergrounding for reasons of cost and security of supply. Partial undergrounding would be like putting a weak link into a strong chain, he said.

DECLAN MOORE, consultant archaeologist, said there would be no direct physical impact on the site of the annual horse fair at Muff, which would be approximately 230m away from the nearest pylon. His assessment showed that there would be views from the cairns on the mountain eastwards towards the proposed development; however these impacts on setting would not be significant.

JOERG SCHULZE, a landscape consultant for EirGrid said the views from Loughanleagh mountain would not be significantly impaired, although the line would be recognisable. He explained how photomontages of pylons against the landscape had been made in accordance with guidelines, using photos taken from public roads or at designated scenic viewpoints such as the car park at Loughanleagh, rather than from the top of the mountain.

 

INTERCONNECTOR DAY29

DAY TWENTY-NINE

This section dealt with individual Monaghan landowners

MARIA MCKENNA, Lisdrumgormly, said she was objecting to having overhead lines put over her lands. This was for reasons of potential health risks; devaluation of the land and restriction on future development; visual impact of the proposed lines; interference with nature and enjoyment of the countryside, as well as safety issues.

She questioned why EirGrid were proposing to erect a pylon on one of the highest points along the proposed route, with no direct access to the site from any public road. The company had revised the access route map and now proposed to enter the field via a gate from a road on another landowner’s field. She feared that two good quality fields would be destroyed by heavy vehicle traffic accessing the pylon construction site and the two stringing areas.

The pylon would be a ninety degree angle tower on a high drumlin. The views from the top of this hill were breathtaking, she said, and the countryside would be spoiled forever by the pylon and lines. Mrs McKenna wanted to know if EirGrid proposed to remove a stone hedgerow boundary between her land and her neighbour’s in order to access the site.

Referring to Drumgallon bog at the lower end of her lands, she said it was teeming with flora and fauna. The massive pylon would be a blot on the landscape and would have a very negative impact on all aspects associated with the enjoyment of the area, including the Monaghan Way walking route.

She hoped An Bord Pleanála would have the courage and foresight to make the right decision in refusing EirGrid’s application or to recommend the lines be put underground. The health and safety, wellbeing of the community and the preservation of the beautiful landscape must be protected, she concluded.

PADRAIG AGNEW, Barraghy, also spoke on behalf of his neighbour MARY HAMILL, Aghamakerr. He said he strongly objected to having pylons in this peaceful farmland.

Cllr SEAN GILLILAND pointed out that the proposed pylon at Barraghy was an angle tower that would be situated in a very wet area of bogland, where there was floodwater all year round. The topography was particularly steep at that point.

DECLAN KEENAN, Ardragh, said the landowners would fight this plan until it was stopped. He questioned EirGrid about proposed access routes to a pylon and guarding area that would be on his land. Construction traffic would totally disturb the routes he used for farm work, he said, and if he was cutting silage, who would get priority? He questioned what would be the benefit of having a pylon on his land. The proposed line would be providing power for Northern Ireland and this supply was an urban problem. Mr Keenan said he was not going to stand by and have his land destroyed.

JIM COYLE, Ardragh, said the overhead line had more minuses than plusses. Buisness people told the hearing they needed the line. But they were freeloading on the farmers. If they wanted it then they would have to pay for it. It would not be done at his or his neighbours’ expense.

He said he would not ever give up on this. If EirGrid bullied us, then we would bully them, he said. If EirGrid win the battle and get the pylons up, then that would not mean they had won the war. He said the proposed development would have a devastating effect on tourism. Mr Coyle also raised questions about a badger sett on the land and about the disinfection process for vehicles as a precaution against disease.

JOHN FINLASS, Ardragh, said the last eight years since the initial plan had been a hell for local people. EirGrid had been dragging it out and this was very unfair. Changes had been made to EirGrid’s transmission line plans in the west and south, so why not in Co. Monaghan? They were not saying they did not want the interconnector, but why not put it underground? He also had concerns about the impact of the construction on badgers that were known to be in the area.

ALLEN MCADAM, Ardragh, said he was strongly opposed to the development on a number of grounds: the potential health effects, devaluation of property, and the limitations to current and future recreational and business use of property. He said the human cost had been enormous and had not been quantified or given due recognition in the weighting of criteria for the route selection.

Mr McAdam explained that in 2007 a cloud came over the community when the project was announced and they had lived under it for nine long years. This war of attrition by the applicant had left families with many sleepless nights; fathers and mothers worrying about their children; sons and daughters worried about their elderly parents.

He said he was very concerned at potential adverse health effects from EMF on his young family of four children under the age of 14, due to the proximity of the lines to their dwelling house and the adjoining fields. The WHO guidelines on EMF exposure levels did not give him great confidence in their accuracy, particularly with the WHO track record on asbestos and smoking.

No specific impact assessment on his property had been provided by EirGrid. The dwelling was approximately 350m from the line; the base of the nearest pylons would be a number of metres higher than the chimney on their two-storey farmhouse.

After speaking to a local auctioneer, he believed the devaluation of property would be enormous, with no compensation available. His family had lived there for 350 years and did not expect the imposition of such a state-sponsored threat to their health, wellbeing and tranquility of the unspoilt countryside.

Mr McAdam claimed the so-called public consultation had been at best farcical. Access to a public meeting in Monaghan was denied, venues were changed at a few hours’ notice and every conceivable attempt was made by EirGrid to mislead and hide the true information until the route was selected. As an Irish citizen he said he was ashamed at the manner in which this state and EU co-financed body had conducted its affairs. He claimed its staff and agents during the hearing had been seen to be under-prepared, lacking in experience and knowledge, and appeared to be indifferent to the views of the people in this area.

Referring to the environmental impact statement, he claimed the multiplicity of errors and mistakes made by EirGrid in interpreting aerial photographs to draw up access routes showed a complete lack of knowledge of what exactly was on the ground. Surveys of habitats had not been conducted as 75% of the lands had not been walked. He questioned why EirGrid did not use it statutory powers to enter the land to carry out these surveys. He wondered if such powers existed at all.

He had attended the previous oral hearing in July 2010 and partook in proceedings at that failed planning application. Mistakes had been made then by EirGrid. This time around despite the endless supply of money to finance its reworking, the enormous staffing resources housed in this hotel for the last two months, this application was in his view infinitely worse.

He reiterated his strong opposition to the application by EirGrid in its current form. He trusted that the very real and grave concerns he had outlined would be fully considered.

He asked the inspectors where he could access the additional information about access routes and clarification provided thus far at the oral hearing. As a directly affected landowner he had not been sent this information and the only details he had seen were in the reports of the Northern Standard.

Mr McAdam concluded: “Make no mistake Inspectors when you are deliberating over the debates at this hearing and adjudicating over the grant of planning: you are not merely deciding on a piece of infrastructure, rather on a project that would have a profound effect on this community, the impact of which could be accurately equated by us who are directly affected as akin to a life sentence, not only for this generation, but also for our children and generations of people to come.”

TERRY LYNCH, Ardragh, appeared with his father SEAN LYNCH. He claimed EirGrid had no real understanding of the geography along the proposed route. Neither did they place any value on the traditions of County Monaghan. He had heard Eirgrid describe this countryside as ‘sparsely populated’.

This was suggestive of almost uninhabited landscape and therefore of little consequence, but nothing could be further from the truth. County Monaghan was a rich tapestry of glacial legacies and the careful hand of human habituation. It was the hedgerows, the ditches, the drumlins, and the bogs, the lanes and right of ways, the homes and farmhouses, the fields and the dolmens; every inch had been accounted for by the carefully managed and slow hand of tradition, he said.

Families had inherited from their predecessors these small enterprises and the traditions, along with the responsibility to look after them and hand them onto the next generation. The value of this tradition and the value of the land and homes was inalienable. But if EirGrid were given permission to overground this project, then the farm and home would become worthless. Families would have nothing of value to hand onto the next generation. EirGrid’s proposal would break traditions that had made the rural landscape of Monaghan unique.

He told the inspectors: “Our farm was bought by my grandfather; my nephew and niece are the fourth generation of our family to walk the land. The farm and home have a rich historic value, dating back to the plantation of Ulster and the Shirley estate. We invested large sums of money in restoring and protecting the house, the labourers’ sleeping quarters, the coach houses and the dispensary, which served as a hospital before and during the famine years. It would have been easy to bulldoze them all, but we sought to preserve as well as develop the farm into a viable enterprise. Years of hard work have paid off and it is a beautiful place to live.”

Mr Lynch said EirGrid’s plan would see a pylon being erected on a rise behind the house and outbuildings. Not only would this compromise the value and charm of the farm, but living under its shadow would change completely their relationship with their home. EirGrid planned to use a private driveway as their construction access point. This would undoubtedly prove a danger as the route passed within yards of the house and right next to the lawn.

Over the period of construction, and for years after, they would effectively become prisoners in their home. The construction route would also see fleets of heavy vehicles thunder right beside one of the historic stone buildings, thereby damaging the foundations. The yard was also too small for heavy vehicles to turn. The construction work would shut down their farm. Their land was recently reseeded and construction would damage the fields they depended on for silage and farm viability.

Mr Lynch pointed out that another proposed construction route passed over a well of significant local historic value. EirGrid had written off undergrounding because it wanted a cheaper way. The company must be told to find a way to put the cables underground, he said.

PHILIP FREEMAN, Ardragh, said he strongly objected to the proposed pylons. He did not know how EirGrid could assess the impact on his farm as low, when the line would split his land in two. He hoped the interconnector would be put underground.

PAUL RUSSELL, Ardragh was accompanied by his son EUGENE RUSSELL. Mr Russell said the people of Monaghan were being treated as second class citizens. Their rights were being taken away and an injustice was being inflicted on them. He hoped the Board would give them justice.

EUGENE RUSSELL, an 18 year-old Leaving Certificate student, addressed the inspectors on issues of health concerns for humans and animals. He was also worried that future development would be affected and that it would not be possible to build a home on land where there was a monstrosity like a pylon. Land values would depreciate, he said. EirGrid should not be allowed to go ahead with the plan and the

line should be put underground, he said. He was also concerned about the visual impact of the infrastructure close to a ringfort near their house.

MARY MCENANEY, Ardragh, stated bluntly: “No way will a pylon go up on my land”. Her house which was built in 1971 would be close to one of the towers. The only change EirGrid had made since the original application was to move the site of the pylon from a field on one side of the road to the other.

TERRY LYNCH, Ardragh, also represented Lawrence Keenan, Corvally, and Thomas McEneaney. One of the pylons EirGrid proposed to erect would be on a high drumlin and it would have a significant visual impact, he said.

JAMES HANNIGAN, Corvally, spoke about the potential health risks and the noise that would come from overhead lines.

PHILIP CONNOLLY, Carrickamore, Corduff, said EirGrid had wasted millions of Euro on the last oral hearing. Now they saw the numbers of highly educated paid staff and experts the company had at this oral hearing, all the documentation and costs involved and there was also a massive advertising campaign locally. The fact that it was ongoing during this public hearing was intimidating and demeaning to a lot of affected stakeholders and in the very least distasteful. All this expense was being funded by Joe Public, the consumer and taxpayer.

EirGrid had told the hearing and the stakeholders many times how they had the power to enter any lands to survey or erect lines. Why didn’t they enter onto the lands at an early stage and do a proper route corridor selection, and then proceed to do a proper EIS with proper site evaluation, accurate visual assessment, etc. WHY ? Instead they have tried to use and indeed abuse stakeholders over the last seven years, and this oral hearing, to try and patch together an EIS.

Mr Connolly said some of the major nineteen changes to access routes submitted by the company in March would impact on residents not previously impacted upon. Some of these people did not make a submission and were still totally unaware of the changes as these details are nowhere for public viewing. EirGrid, he said, had tried to close the stable door after the horse had bolted.

What the Board must really ask themselves now is, taking into account that EirGrid had unrestricted physical access to every single one of the entry points on the public road along with their LIDAR and they can make so many (47 documented so far, and more to come) serious errors or anomalies, how can you trust the accuracy of the positioning of the pylon sites where they had no physical survey at all. Many pylons could be in laneways or out on the road. How can the Board have any faith in any of the drawings on this application?

The developer should have made available a 3D model of this project to enable the public and indeed the Board to be able to properly visualise its scale, nature and the visual effect on the landscape. All the maps, drawings and folders do nothing to help the stakeholders visualise its effects.

Whooper swans flight paths and wintering are a significant impact on the route corridor in my local area. Mitigation measures are proposed i.e. hanging large deflectors on lines. These will greatly increase the negative non mitigatable impact of the lines on route A. Was this extra visual impact taken into account in route selection?

As EirGrid states itself, no new consultation was carried out for the first two of five stages for this project. This application states that it would be a normal scenario for a project development like this to have consultation from stage one but that this application is unique. This one is unique alright, but unique is no excuse or reason for not doing planning properly. Take for example those new residents in corridor A who were not there in 2007. They have been denied their statutory right to consultation at the earliest stage.

The final route constraints report 2007, on which the preliminary evaluation and final evaluation reports are based never mention the town of Shercock when it lists towns and settlements in the study area. The preliminary re-evaluation 2011 report 5.2.2 page 72 lists the settlements in the Cavan – Monaghan study area; Carrickmacross, Castleblayney, Annyalla, Doohamlet, Oram, Lough Egish, Broomfield, Laragh, Lisdoonan, Corduff, Donaghmoyne, Magheracloone and Kingscourt.

Nowhere is Shercock mentioned in this report either. It is gross incompetence to omit Shercock in the first report but what sort of re-evaluation was carried out to miss it yet again in the 2011 re-evaluation? It wasn’t re-evaluation, it was rubber stamping. Shercock lies 2.9 km from the proposed line. I believe it is the closest town to that line. It is definitely the only town that can see several pylons from the main street.

The EIS and many other section of this application are inadequate, factually incorrect, unsuitable and littered with errors omissions and mis-information. It is based on old, outdated reports, surveys and consultation and the Board has a responsibility to ensure that all relevant planning requirements are met, no matter what the scale or deemed demand or pressure for the project. This application falls way short in many aspects, he said.

INTERCONNECTOR DAY28

DAY TWENTY-EIGHT

This section involved landowners and groups from Co. Monaghan. Part of it focused on the small townland of Cornasassonagh, which has twenty houses and is one of the most populated townlands in South Monaghan.

MARY MARRON, Corbane, spoke on behalf of her husband Philip and their two children. They owned farmland in Ummerafree and Cornasassonagh. Their extended family had lived and farmed in these townlands for generations and were horrified at the proposed development.

She said the construction of the proposed 400kV overhead power line would have a serious detrimental effect on the Monaghan countryside from a farming aspect. Owing to the drumlin landscape, field sizes tended to be small. By placing pylons in a field or along a hedgerow, it would have an enormous impact on the usable space relative to the size of the field. Trees and hedgerows contributed significantly to biodiversity and landscape character in County Monaghan.

From the family home, they could see as far as Derrylin, Co Fermanagh on a clear day and the wind turbines in Latton were clearly visible all year round. The visual impact of the proposed pylons would be immense. She told the inspectors she would be able to see at least six pylons from the front of her house and ten to twelve pylons from their stables.

Their land at Ummerafree consisted of four small fields, totalling 12 acres in size, representing one-third of their total farmland. They also rented approximately 20 acres on the opposite side of the road, where it was proposed that pylon no. 181 would be erected.

EirGrid proposed to enter their land through what they referred to as an existing track. It was in fact a rough path leading from the entrance gate across the river. The gateway into this “track” was 4m wide and wholly unsuitable for large machinery, she said. The lower sections of the fields were wet and marshy and not suitable for driving across for the majority of the year. EirGrid had not advised them what time of year they intended to complete the works. If it was to be during Spring/Summer, this would have an impact on slurry/fertiliser spreading and grazing. If they intended to complete the works during Autumn/Winter, the ground would be too wet to drive on and would be churned up. Our land would be irreversibly devalued by the development and any future development planned by our children would be restricted.

EirGrid proposed to erect the pylon on one of the steepest parts of the land and extensive excavation would be needed. With this excavation came the issue of the slippage of the remaining soil on the upper section of the hill and access to and from this site. To the best of her knowledge, EirGrid had not stated how they proposed to excavate the volume of soil necessary, whether they intended to dispose it or store it on site. The disposal and removal of spoil materials must be accounted for and not left to others to address, she said.

EirGrid mentioned that the land would be reinstated to its original condition once the development was completed. She wondered how long this would take. Because of the pylons, they would not be able to carry out normal farming practices such as slurry spreading, owing to the dangers involved. They would not be able to pass safely beneath the wires with tractors as the sag would be too low due to the gradient and the distance from the adjoining pylons. It would be unsafe to carry out drainage works, reseeding, etc in the vicinity of the pylons thus preventing them from carrying out land improvement works and furthering the business potential of the land.

They had two herds of pedigree Charolais cattle and bloodstock which they grazed both on the affected land and the rented land. Charolais cattle and bloodstock by their nature were highly strung and flighty and would be sensitive both to the volume and variety of traffic and people moving through the fields and the associated noise. They could become very aggressive when confronted by the unknown. This could lead to a bull or cow attacking construction personnel with deadly consequences. How will EirGrid mitigate against this?, she asked.

The health of our livestock is paramount, she said. The Department of Agriculture had very strict guidelines on the movement of cattle and the spread of disease and they would be concerned about disease being carried onto their lands from adjoining farms by the machinery. They were also extremely concerned about the issue of insurance.

They were concerned about the health and safety aspects of the development. They had serious concerns about the damage that would be caused to the roads, the safety of the community that used them and the safety of livestock that walked them. The road networks in Co Monaghan especially in the Corduff area were wholly unsuitable for the volume and type of vehicles that would be required if the development went ahead. Many were single lane roads on which two vehicles were incapable of passing unless one pulled into a gateway.

Noise pollution from overhead high voltage lines was of huge concern, particularly in wet weather. Mrs Marron said the noise from the 110kv power line currently running alongside her family home was horrendous during damp weather and it was like having someone welding outside the window.

It seems that once again, EirGrid had submitted a farcical planning application, with no regard to the landowners and local communities of the affected counties. It was beyond belief how this oral hearing had been permitted to proceed, when EirGrid had continuously shown themselves to be incompetent. The fact that they had been permitted to produce maps twice at this stage detailing new access routes was absurd and they had reserved the right to produce more if they deemed it necessary. Today they were actually redoing an access route as the observers looked on. EirGrid had produced a seriously flawed and misleading Environmental Impact Statement and were now being allowed to redo it as they went along, using information provided by the landowners and communities.

“Over the past five years I have as a member of the Monaghan Anti Pylon Committee attended meeting after meeting with EirGrid representatives, where they were always willing to take concerns on board, only to find out afterwards that it was a box- ticking exercise.”

She went on: “I have sat at this oral hearing and indeed the previous one listening to parents crying while putting their private business in the public domain pleading with Bord Pleanála to take their childrens’ medical needs into account when deciding the outcome of this application when EirGrid would not. I have watched changes to landowner maps being discussed and put in the public domain without landowners having received prior notification. I have watched as landowners have asked question after question without ever receiving a straight answer. EirGrid’s experts have hidden behind sub- sections and modules from day one and have been allowed to do so by you, the inspectors. In the event that they are being put under pressure the legal team comes to the rescue and if this is still not enough the questioner is then instructed to move on. There seems to be a rush to get this oral hearing finished. Why?

You the Board and EirGrid are being paid to be here and do your job. Landowners and other observers are here having taken time off work and putting our case forward at our own expense.”

Mary Marron concluded: “Observers have noted the huge complement of staff and legal expertise which EirGrid have at their disposal. A seemingly bottomless pit of money to get this project pushed through, who despite already having failed once seem to have learned nothing. The might of the State against the little man – though as Leicster City FC have proved, sometimes the little man can win.

From day one this project has had no public acceptance. Anything landowners and observers have witnessed in the conduct of this oral hearing has only served to reinforce their determination that this 400kV line will never be built overground through the counties of Monaghan, Cavan and Meath”.

CON CURTIN, agricultural consultant, said there were no effects on the health of livestock from electromagnetic fields. He also explained measures that the designated contarctor would be taking to prevent the spread of animal disease.

NOEL FOX, Tullyglass, said he had never been properly consulted by EirGrid and did not want EirGrid to put two pylons on his land. The construction work would completely disrupt his farm and work. There was only one access to his farm and he needed it at all times. He would not allow EirGrid in.

“This is my home”, he told the inspectors.

PEADAR CLINTON, Bocks Lower, said their forefathers had fought for the land one hundred years ago. Now the company was taking their freedom away, but the people of Monaghan and Cavan would not let EirGrid do so. He pointed out that there was a pond on his land where moorhen were breeding. He was afraid of the adverse effect the line would cause.

Dr PATRICK CRUSHELL, consultant ecologist for EirGrid said ecology impacts and precautionary mitigation regarding wildfowl, including moorhen, had been considered as part of the Environmental Impact Statement. The pond mentioned by Mr Clinton was identified in the habitat maps and report. Dr Crushell said moorhen would be expected to continue to use the pond notwithstanding the construction and operation of the proposed development.

OWEN and HELEN MCCABE with their neighbours PATSY and ANN IRWIN, Cornasassonagh, said the proposed line was going to have a massive visual impact on what was a very scenic area. Mr McCabe said the wires would be 62m from their kitchen table. His wife Helen said three towers would be visible from their house at all times. The nearest pylon would be 156m away from their home and farm.

SEAMUS MARRON, Cornasassonagh, questioned the access route for a guarding area that EirGrid had proposed. The map showed it going through an eight foot high wall at the end of his farmyard. There was also a well close to the guarding area.

ROBERT ARTHUR for EirGrid said they did not intend to remove the wall but would used another viable entrance to the field at that point. JOHN DILLON, a consultant environmental engineer, said they would monitor the water quality at the well and would take samples to ensure it was not affected by the construction work. In a number of similar cases he told landowners EirGrid would ensure that an alternative supply such as a water tanker was supplied and the well would be restored to its original condition, if any damage was caused.

DES MARRON, Cornasassonagh, said he had not been contacted by EirGrid and he had no intention of letting them put up a pylon on his land. Nobody wanted the pylons and they would all do whatever it took to stop them going up. Don’t waste any more money: put the wires underground, he told EirGrid.

PHILIP MALONE, Cornasassonagh, said the power lines would cause complete destruction to his farm and house. He was concerned that vibrations from the machinery used to access the construction site would cause damage to the foundations of an old stone house that he was renovating.

BARRY SHERIDAN, acoustic consultant, said they could monitor the building using sensors to ensure that any vibrations were within the prescribed limits.

PLUNKETT CORRIGAN, Cornasassonagh, said the proposed route of the lines would overlook one of the most scenic areas in Monaghan. There was a big area of wetlands in the area and he expressed concern about the potential effects on wildlife including whooper swans, snipe, badgers and birds. The EirGrid EIS report had not mentioned the wetlands, he claimed.

Dr PATRICK CRUSHELL, consultant ecologist for EirGrid, said the Bocks Lough site was not officially designated. He said the wetlands had been evaluated from the roadside and the development would not have an effect. The flight path of whooper swans did not regularly cross the route of the line here.

ALAN MCMAHON owns land at Corbane. He said he had not received maps from EirGrid for consultation. A lawyer for EirGrid said the first correspondence with Mr McMahon had been in May 2015. When EirGrid were asked to check their records, it was discovered that they had written to a previous title holder in 2013. After further questioning it was discovered that the company had been notified by the Property Registration Authority in October 2014 of a change in ownership. This was a blatant breach of consultation, according to Nigel Hillis of CMAPC.

EDGAR EAKINS, Corduff, posed a series of questions to EirGrid. He said the power lines would affect GPS equipment used by agricultural contractors. He had concerns about his children playing under the lines and the potential effects on health. “I do not want EirGrid coming onto my property. I am prepared to go to jail if this line goes ahead and if I go to jail, then my children will go as well”, he told the inspectors.

AIDAN GEOGHEGAN, EirGrid Project Manager, said overhead lines would not interfere with any GPS system as they were designed to be immune from interference from such lines.

Mr Eakins had further questions about the effect on farming practices and these were put to EirGrid by ALLEN MCADAM. He wanted to know what would happen if farmers were members of the new agri-environment scheme GLAS and needed to reinstate any ground that was damaged during the construction of pylons. Mr McAdam said that farmers in the scheme could be penalized for re-seeding low input and permanent pasture.

JIMMY MARRON and HUGH FINNEGAN, Ummerafree, raised questions about access routes and the devaluation of land which they believed the interconnector would cause. “The lines would go right across my farm and would put me out of business”, Mr Finnegan said.

ROBERT ARTHUR of ESB International said there would be no sterilisation of land outside the footprint of each pylon.

PAUL KEENAN, Sreenty, was concerned about the positioning of pylon 186 which he said would be sticking out like a sore thumb. It was probably the highest along the route and it would be on a par with Corduff mountain. There was a 360 degree panoramic view from the hill, and you could see as far as Dundalk Bay and the Mournes.

Mr Keenan said the project was being built to supply the UK at our expense. Local people should not be sacrificed for someone else’s power needs, in his view. EirGrid had no morals at all, he claimed. He said they were totally opposed to the plan. Under no circumstances would EirGrid be allowed on their land so that they would suffer in future, he concluded to applause from the other objectors present.

Some landowners posed a direct question to EirGrid staff and to the inspectors, asking them how they would like to live in a house beside a pylon and power lines.

JARLATH FITZSIMONS SC for EirGrid said individual opinions were not a determining factor. The process was about the proper planning and sustainable development of the project and submissions received that were relevant to the assessment to be made by the Board. He also said there would be no micro-siting of the proposed pylons. Their position had been identified and would not be subject to any deviation.

INTERCONNECTOR DAY27

­­­­­­­­DAY TWENTY-SEVEN

This section dealt with the Baile Phib Gaeltacht near Navan, Co. Meath

Three submissions were made to the hearing in Irish concerning the importance of the Baile Ghib Gaeltacht in Co. Meath and how it could be affected by EirGrid’s interconnector plan. Questioned by a local resident, a consultant archaeologist for EirGrid confirmed that the power lines would at one point near Oristown pass over the route of the Tain Bó Cuailgne march.

Uinsionn O Gairbhi a local resident explained the history of the area. This Gaeltacht was founded in 1937, when twenty Irish-speaking families were moved from the west coast of Ireland under the Land Commission. Each family received a house, 22 acres, farm animals and implents in exchange for land and property in their native county. Baile Ghib was eventually given official Gaeltacht status, along with Ráth Cairn in 1967.

Mr O Gairbhi said young children from Dublin, Navan, Kells and Drogheda came to the area to learn Irish. If the pylons and power lines were erected they would constitute a danger zone that would have to be avoided. These dangerous wires must be put underground, he said, so that the health of people would not be in danger and they would not interfere with the beauty of the area.

Athboy resident Cathal Seoige a former member of Údarás na Gaeltachta said Baile Ghib was full of heritage and history. He also called for the high voltage lines not to go through the area and insisted they should be placed underground.

Máire Nic an tSithigh also called on EirGrid to put the interconnector underground and said this would be the best solution for our language and heritage.

EirGrid Project Manager Aidan Geoghegan said that after considering the technical, environmental and economic aspects they considered that an underground HVDC cable would not be appropriate. He said there had been 400kV overhead lines in Ireland for the past thirty years. They were very reliable and performed well even in bad weather.

Consultant archaeologist for EirGrid Declan Moore said the overhead lines would have no direct physical impact on the Táin route and it was not a registered recorded monument. In answer to Maura Sheehy he revealed that the Táin route would pass under the proposed development close to Oristown.

This section involved landowners and groups from Co. Monaghan

BERNIE RUTH, Secretary of the Corduff Raferagh Heritage Group explained that it was set up in 2000 to share, preserve and archive the local heritage. She was sure the professionals from EirGrid had exmined the myriad of maps available to them to check for any archaeological sites of interest. But what they did not have was local knowledge, local interest and local passion, which their voluntary group had.

There was a cillín in Corrinenty, an unmarked burial ground for unbaptised children, in very close proximity to the planned line and a pylon. There were Mass rocks in Greaghlatacapple and Umerafree, and Mass was celebrated annually at Greaghlatacapple, which would be within view of many of the pylons. There were many more places of interest to them—the locals—within the area.

Each year they held a number of heritage walks around the townlands, pointing out items of local history and gathering information from local people. Currently they were recording and photographing old structures like buildings, gates, piers and bridges. Quite often the pictures were impeded by the current ESB or telephone poles. What would it be like with pylons and heavy lines?

The group was planning to re-establish the old Mass path on Corduff mountain, with a viewing area on the summit where you can see as far as Cavan, Louth, Meath and Armagh. But with the possibility of viewing more pylons than scenery, this project might have to be abandoned.

The heritage group, like the majority of their neighbours, were ordinary people, living ordinary lives. They had no objection to progress but hoped that An Bord Pleanála and EirGrid used common sense and buried the lines, not only in the interest of preserving the beautiful drumlin landscape and their heritage,but most importantly their future mental and physical health.

She said that she lived two fields away from one of the proposed pylons, on a narrow country road that was used by many people for their daily recreational walk. She did not think there was any person who had come to this hearing over the past 26 days, no matter which side of the room they were on, who would let their children, siblings, parents or any family member live under or near these pylons or lines, no matter what the experts said. The experts did not always get it right, she added.

Bernie Ruth said that to allow the project go ahead as planned when there was an alternative would be a shame and a disgrace to each and every person present at the hearing. It was now time to use common sense and to bury the lines, not our people.

JAMES BANNINGAN, Tossey, Secretary of Lough Egish Gun Club, said three or four of the proposed towers and the power line would be highly visible from the main road between Lough Egish and Castleblayney. He expressed concerns about the possible leakage of silt from construction sites into the lake.

There were dangers for fly fishermen who were fishing near power lines, he said. He was worried about the possible effects on angling tourism.

SEAMUS QUINN, Cooltrim Egish, said EirGrid wold never be allowed into his land and he hoped they did not get planning permission. One of the proposed pylons wold be right in front of his house, he said.

GABRIEL WARD, Tooa, referred to the flora and fauna and wildlife in the former Shantonagh House estate. The woodland contained various types of trees including oak, ash and hazel. A lot of people went for walks in the area, which also contained two old flax mills. Bats had been known to roost in the area.

The following landowners were represented by NIGEL HILLS, who questioned EirGrid on their behalf: Roy Brown, Eamonn Kerr, Philip McDermott, Enda and Rose Duffy, Margaret O’Neill, Peadar McSkeane, Joe Boylan, Kevin Duffy and family, Patrick and Sarah Duffy, Hugh and Bernadette Duffy, Colman and Patricia Ryan, Eileen Smyth, Eamonn McNally, Gene Connolly, and Jim and Mary Connolly. He raised their concerns about access routes, pylon locations, the lack of consultation, health and safety, farm impacts, land and property devaluation, development restrictions, and the effect on flora and fauna.

INTERCONNECTOR WEEK9

‘END THIS COSTLY CHARADE’ SAY ANTI-PYLON CAMPAIGNERS

EIRGRID ACCUSED OF TURNING HEARING INTO FARCE AFTER MORE CHANGES MADE TO ITS PLANNING APPLICATION

Michael Fisher    MEATH CHRONICLE   p.1

EirGrid has been accused by anti-pylon campaigners in Meath and Monaghan of making up their application as they go along. They have accused the semi-state company of turning the planning procedure into an absolute disgrace during the oral hearing into the proposed North/South electricity interconnector. The North East Pylon Pressure Campaign called on An Bord Pleanála to put an end to what they said was a “costly charade”.

It follows the introduction by the company for the third time of modified access routes along narrow country lanes that would be used by contractors building the latticed steel pylons and erecting the power lines. Thirty-two separate changes have now been made by EirGrid since the hearing began last month.

On day 26 of the oral hearing a lawyer for EirGrid Jarlath Fitzsimons SC said there had been an ongoing review of the 584 temporary routes identified. Six new ones had been notified to An Bord Pleanála on the first day at the Nuremore Hotel on March 7th. Nineteen more changes were made a fortnight later following the discovery of discrepancies in mapping. Shortly before the close of proceedings last week, Mr Fitzsimons revealed seven more alterations to access routes. A further eleven minor mapping modifications to the routes were identified. According to the lawyer, EirGrid had responded in a positive way to observations made by landowners during the course of the hearing regarding specific tower locations.

Temporary access routes are included in the application to enable An Bord Pleanála to conduct an environmental assessment of all aspects of the proposed development. EirGrid spokesperson David Martin said: “With a total of 584 temporary access routes in the planning application, it is understandable that modifications to a small number have been proposed as information comes from observations made at the oral hearing and also from the continuing reviews.”

“In order to enter the area for the proposed development, we have identified 584 temporary access routes. We have listened with interest to the detailed submissions given by landowners along the proposed line route. Several have focused on the detail of the temporary access routes. This feedback has been very helpful as we endeavour to provide the most convenient access routes possible for landowners.”

The hearing in Carrickmacross in front of two Bord Pleanála inspectors is now in its ninth week and is not expected to finish until the end of May. It’s one of the longest such planning enquiries into what is one of the largest ever infrastructure projects in the state. EirGrid is proposing to erect a 400kV high voltage line with 400 pylons from Woodland in Co. Meath across parts of Cavan and Meath into Co. Armagh and finishing at Turleenan near the Moy in Co. Tyrone.

On the 22nd March, during week three of the hearing EirGrid announced a number of major flaws in its planning application and made a request to An Bord Pleanála (ABP) to change nineteen access entrances and routes to landowner properties. The NEPPC said landowners had neither been notified of nor consulted on these plans at this stage. EirGrid conceded that all landowners needed to be notified.

On Tuesday 26th April, EirGrid yet again announced without any prior notice a further request to ABP to change an additional 18 access routes, making ‘minor deviations’ to access route maps. The affected landowners, similar to the situation pertaining in March, had neither been notified of nor consulted on these plans at this stage. EirGrid again conceded that all landowners needed to be notified.

NEPPC in a statement pointed out that based on the extraordinary revelations on 22nd March they had requested the two inspectors to seek approval from the Planning Board that the hearing be halted. The inspectors had decided to continue with the hearing. NEPPC then wrote to An Bord Pleanála directly, requesting that at least the access route changes and other errata in the planning application be updated on the planning application website, but they had still not received any response. NEPPC said the latest changes made a mockery of the oral hearing and of the planning process itself. NEPPC called on An Bord to halt the oral hearing and take responsibility for not allowing the public’s time and money to be wasted by what they said were EirGrid’s farcical activities.

Spokesman Padraig O’Reilly said: “EirGrid is being allowed to make wholesale changes to its planning application on an ongoing basis, without so much as a query from ABP. It looks like EirGrid is running the show all by itself. In the latest letter received by landowners, where they have been informed of changes to accessing their lands, EirGrid states in relation to the ongoing oral hearing that “We will of course facilitate any submission you may wish to make arising from this modified access route”.

“The official position from An Bord was that anyone who wanted to make a submission to the oral hearing firstly had to have made a written submission by August 24th 2015 and then submit a request to make an oral submission by February 4th 2016. Yet EirGrid were now writing to landowners as if it was representing An Bord Pleanála (ABP) and making up their own rules for the oral hearing participation. ABP needs to quickly get a grip here before the whole integrity of the process in general is destroyed. It is simply not acceptable to sit on its hands and watch EirGrid take this brazen approach”, he said.

“NEPPC is yet again calling on elected representatives to put an end to this farcical situation. EirGrid is making a mockery of the strategic infrastructure process for a second time in five years. We cannot have a situation where a state company can remain immune to accountability and in so doing drain public confidence and bring the strategic infrastructure process into disrepute”, the statement added.

Mary Marron of the County Monaghan Anti-Pylon Committee said what was going on was an absolute disgrace. She wondered if more information was going to be added during the rest of the hearing. People had been coming into the hearing and pointing out to EirGrid errors in the access routes. If this was what was going to happen continually then the remaining landowners due to make submissions would have to decide if there was any point.

Monaghan Fine Gael Councillor Sean Gilliland said he found EirGrid’s approach to be absolutely insulting to the An Bord and to the local communities in the county. EirGrid believed they had identified issues with access routes but it was the public who had done so. Cllr Gilliland wondered if the environmental impact reports were wrong then were the health reports flawed as well? Our lives and the future of our young people are in your hands, he told the inspectors.

Cllr Gilliland said the planning application was flawed. On behalf of people in this rural part of Ireland he said he was begging the inspectors to consider the recent submissions made by landowners and householders, all of whom objected to the overhead power lines. What was happening was unjust and absolutely contrary to democracy and civil rights. It was not morally right nor would it ever be. They were being pushed into the mud by EirGrid who were taking information and re-presenting it in submissions they did not understand.